Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Terregra Asia Energy Tbk. (TGRA) vs Wijaya Karya Beton Tbk. (WTON)

Terregra Asia Energy Tbk.Trading
Wijaya Karya Beton Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Terregra Asia Energy Tbk. dan Wijaya Karya Beton Tbk.: Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M), sedangkan Wijaya Karya Beton Tbk. diperdagangkan di Rp79 (kapitalisasi pasar 688,52 M, volume 24 jam 1,73 jt). Perbedaan utamanya: Wijaya Karya Beton Tbk. jauh lebih besar — sekitar 9,3× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

TGRAWTON
Kapitalisasi Pasar
74,25 M688,52 M
Volume
1,73 jt
Lot
17,3 rb
Perputaran
135,53 jt
Harga Rata-rata
78,34
Nilai Transaksi
135,53 jt
Harga Ekuilibrium Indikatif
79
Volume Ekuilibrium Indikatif
103

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

TGRA
Lihat detail
WTON
Lihat detail

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA

Tentang Wijaya Karya Beton Tbk.

PT. Wijaya Karya Beton (the Company), to hereafter with Wika Beton, was esthablished in Jakarta with the deed of a limited liability company PT Wijaya Karya Beton No 44 dated March 11, 1997 (Act No 44), made in the presence of Achmad Bajuri, SH, as successor of the Imas Fatimah, SH, notary in Jakarta PT Wijaya Karya Beton operational activities started since March 11, 1997

Selengkapnya di halaman WTON