Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Terregra Asia Energy Tbk. (TGRA) vs Vastland Indonesia Tbk. (VAST)

Terregra Asia Energy Tbk.Trading
Vastland Indonesia Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Terregra Asia Energy Tbk. dan Vastland Indonesia Tbk.: Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M), sedangkan Vastland Indonesia Tbk. diperdagangkan di Rp113 (kapitalisasi pasar 336,13 M, volume 24 jam 3,61 jt). Perbedaan utamanya: Vastland Indonesia Tbk. jauh lebih besar — sekitar 4,5× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

TGRAVAST
Kapitalisasi Pasar
74,25 M336,13 M
Volume
3,61 jt
Lot
36,15 rb
Perputaran
405,24 jt
Harga Rata-rata
112,11
Nilai Transaksi
405,24 jt
Harga Ekuilibrium Indikatif
113
Volume Ekuilibrium Indikatif
1 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

TGRA
Lihat detail
VAST
Lihat detail

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA

Tentang Vastland Indonesia Tbk.

PT Vastland Indonesia Tbk (the Company) was established based on Deed No. 16 dated 21 February 2011 from Adrian Djuani, S.H., Notary in Jakarta. The Companys start its commercial operation on 2012.

Selengkapnya di halaman VAST