Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Tianrong Chemicals Industry Tbk. (TDPM) vs Terregra Asia Energy Tbk. (TGRA)

Tianrong Chemicals Industry Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Tianrong Chemicals Industry Tbk. dan Terregra Asia Energy Tbk.: Tianrong Chemicals Industry Tbk. diperdagangkan di Rp119 (kapitalisasi pasar 1,25 T), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Tianrong Chemicals Industry Tbk. jauh lebih besar — sekitar 16,8× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

TDPMTGRA
Kapitalisasi Pasar
1,25 T74,25 M

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

TDPM
Lihat detail
TGRA
Lihat detail

Tentang Tianrong Chemicals Industry Tbk.

PT Tridomain Performance Materials (previously PT Royal Chemie Indonesia) (the "Company”) was established on December 16, 2003 under the framework of the Foreign Capital Investment Law No. 1 Year 1967 (as amended by Law No. 11 Year 1970) based on the notarial deed No. 51 of Veronica Nataadmadja, S.H., Notary in Jakarta.

Selengkapnya di halaman TDPM

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA