Perbedaan Sugih Energy Tbk. dan Terregra Asia Energy Tbk.: Sugih Energy Tbk. diperdagangkan di Rp50 (kapitalisasi pasar 1,24 T), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Sugih Energy Tbk. jauh lebih besar — sekitar 16,7× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| SUGI | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 1,24 T | 74,25 M |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Sugih Energy Tbk was established based on Notarial Deed No. 90, in Jakarta as PT. Saranatama Unimada Gunabina International on March 26th 1990. On 1992, corporate began the operation as sole agent of diesel generator leasing company, Aggreko Benerator, Plc., Australia. On 1997, corporate elected as Daewoo heavy equipments sole agent, but caused of monetary & political crisis in Indonesia, corporate return the agency. On 2000, corporate develope the automotive spare parts distributor business, that was handled by PT. Prima Samapersada (afiliated) which conducted in this business since 1982. On 2001, corporate continued the agency of HINO Truck from PT. Indo Samapersada (afiliated) untill now.
Selengkapnya di halaman SUGI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →