Perbedaan Sona Topas Tourism Industry Tbk. dan Terregra Asia Energy Tbk.: Sona Topas Tourism Industry Tbk. diperdagangkan di Rp2.250 (kapitalisasi pasar 1,49 T, volume 24 jam 8,7 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Sona Topas Tourism Industry Tbk. jauh lebih besar — sekitar 20,1× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| SONA | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 1,49 T | 74,25 M |
Volume | 8,7 rb | — |
Lot | 87 | — |
Perputaran | 19,49 jt | — |
Harga Rata-rata | 2.240,57 | — |
Nilai Transaksi | 19,49 jt | — |
Harga Ekuilibrium Indikatif | 2.250 | — |
Volume Ekuilibrium Indikatif | 5 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Sona Topas Tourism Industry Tbk (the Company) was established based on notarial deed No.56 dated August 25, 1978 of Djonny Imam Soedjono for Edison Sianipar SH, under the name of PT Sona Topas Group. PT Sona Topas Tourism Industry Tbk has focused on providing tourism related services. The Company became a public listed company in July 1992 when it made an IPO and currently, all its 165,600,000 shares are traded on the JSX. The Company’s commercial operations started in 1980.
Selengkapnya di halaman SONA →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →