Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja PP (Persero) Tbk. (PTPP) vs Terregra Asia Energy Tbk. (TGRA)

PP (Persero) Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan PP (Persero) Tbk. dan Terregra Asia Energy Tbk.: PP (Persero) Tbk. diperdagangkan di Rp199 (kapitalisasi pasar 1,25 T, volume 24 jam 13,56 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: PP (Persero) Tbk. jauh lebih besar — sekitar 16,8× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

PTPPTGRA
Kapitalisasi Pasar
1,25 T74,25 M
Volume
13,56 jt
Lot
135,63 rb
Perputaran
2,67 M
Harga Rata-rata
196,84
Nilai Transaksi
2,67 M
Harga Ekuilibrium Indikatif
199
Volume Ekuilibrium Indikatif
530

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

PTPP
Lihat detail
TGRA
Lihat detail

Tentang PP (Persero) Tbk.

PT PP (Persero) was established under the name of NV Pembangunan Perumahan based on the Notarial Deed No. 48 of August 26, 1953. At the time it was established PT PP (Persero) was entrusted to build houses for the officers of PT Semen Gresik Tbk, a subsidiary of BAPINDO in Gresik. Along with increased trust, PT PP (Persero) received the duty to construct large projects that were related to war compensations the Government of Japan paid to the Republic of Indonesia, namely : - Hotel Indonesia, Bali Beach Hotel, - Ambarukmo Palace Hotel and - Samudera Beach Hotel.1960 In compliance to Government Regulation No. 63 year 1960, PN (Perusahaan Negara) Pembangunan Perumahan changed into PN Pembangunan Perumahan. 1962 In 1962, PT PP (Persero) completed the construction of Hotel Indonesia, a 14 stories with 427 rooms, which at the time was the highest building in Indonesia. 1971 In compliance to the Government Regulation No. 39 year 1971, PN Pembangunan Perumahan changed and become PT Pembangunan Perumahan (Persero), which was legalized through the Deed No. 78 dated March 15, 1973. The Company's core business was construction services. 1991-2007 For more than five decades, PT PP (Persero) has been a key player in the national construction business. Several mega projects have been constructed in that period. Subsequently, starting in 1991, PT PP (Persero) diversified its business, including office space rental at Plaza PP and realty business development in the area of Cibubur, and also the establishment of several subsidiaries through partnerships with foreign companies, among others PT PP Taisei Indonesia Construction and PT Mitracipta Polasarana.

Selengkapnya di halaman PTPP

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA