Perbedaan Bukit Asam Tbk. dan Terregra Asia Energy Tbk.: Bukit Asam Tbk. diperdagangkan di Rp3.100 (kapitalisasi pasar 35,71 T, volume 24 jam 51,29 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Bukit Asam Tbk. jauh lebih besar — sekitar 480,9× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| PTBA | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 35,71 T | 74,25 M |
Volume | 51,29 jt | — |
Lot | 512,91 rb | — |
Perputaran | 158,66 M | — |
Harga Rata-rata | 3.093,33 | — |
Nilai Transaksi | 158,66 M | — |
Harga Ekuilibrium Indikatif | 3.100 | — |
Volume Ekuilibrium Indikatif | 15,39 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Bukit Asam (Persero) Tbk was established on March 2nd 1981 in Tanjung Enim as PT. Tambang Batubara Bukit Asam. However the mine working have been exploited since 1919 under Government of Netherland Indie. Take over by Japan on 1942, and nationalized by Indonesian Government on 1945. On October 30th 1990, government merged Perum Tambang Batubara, Sawahlunto in the corporate. On 1983, corporate assigned by government to develop coal briquet. Employees 4021 personnel.
Selengkapnya di halaman PTBA →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →