Perbedaan Red Planet Indonesia Tbk. dan Terregra Asia Energy Tbk.: Red Planet Indonesia Tbk. diperdagangkan di Rp242 (kapitalisasi pasar 2,44 T, volume 24 jam 17,31 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Red Planet Indonesia Tbk. jauh lebih besar — sekitar 32,9× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| PSKT | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 2,44 T | 74,25 M |
Volume | 17,31 jt | — |
Lot | 173,1 rb | — |
Perputaran | 4,1 M | — |
Harga Rata-rata | 236,99 | — |
Nilai Transaksi | 4,1 M | — |
Harga Ekuilibrium Indikatif | 242 | — |
Volume Ekuilibrium Indikatif | 1,51 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Red Planet Indonesia Tbk (formerly PT Pusako Tarinka Tbk) was established under its original name of PT Mustika Manggilingan based on Notarial Deed No. 93 dated April 10, 1989 of Yudo Paripurno, S.H., notary in Jakarta. PT Pusako Tarinka Tbk is an Indonesia-based hotel operator. Its hotel is located in Bukit Tinggi, West Sumatera province, Indonesia. The Company is headquartered in Jakarta, Indonesia
Selengkapnya di halaman PSKT →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →