Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Pinago Utama Tbk. (PNGO) vs Terregra Asia Energy Tbk. (TGRA)

Pinago Utama Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Pinago Utama Tbk. dan Terregra Asia Energy Tbk.: Pinago Utama Tbk. diperdagangkan di Rp3.500 (kapitalisasi pasar 2,73 T, volume 24 jam 1 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Pinago Utama Tbk. jauh lebih besar — sekitar 36,8× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

PNGOTGRA
Kapitalisasi Pasar
2,73 T74,25 M
Volume
1 rb
Lot
10
Perputaran
3,5 jt
Harga Rata-rata
3.500
Nilai Transaksi
3,5 jt
Harga Ekuilibrium Indikatif
3.500
Volume Ekuilibrium Indikatif
1 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

PNGO
Lihat detail
TGRA
Lihat detail

Tentang Pinago Utama Tbk.

PT Pinago Utama Tbk was established based on Deed No.15, dated May 12, 1979 made by Aminus, SH, notary in Palembang. The Company started its commercial operations in 1991.

Selengkapnya di halaman PNGO

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA