Perbedaan Destinasi Tirta Nusantara Tbk dan Terregra Asia Energy Tbk.: Destinasi Tirta Nusantara Tbk diperdagangkan di Rp384 (kapitalisasi pasar 275,99 M, volume 24 jam 77,3 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Destinasi Tirta Nusantara Tbk jauh lebih besar — sekitar 3,7× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| PDES | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 275,99 M | 74,25 M |
Volume | 77,3 rb | — |
Lot | 773 | — |
Perputaran | 29,21 jt | — |
Harga Rata-rata | 377,92 | — |
Nilai Transaksi | 29,21 jt | — |
Harga Ekuilibrium Indikatif | 384 | — |
Volume Ekuilibrium Indikatif | 200 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Destinasi Tirta Nusantara Tbk (the company) was established on 30 Oct 1999 based on Notaries Deed No. 36 and the deed of establishment was approved by the the Ministry of Justice dated Feb 23, 2000. The Company’s articles of association has been amended several times, most recently by notarial deed No. 187 and No.136 of Wijanto Suwongso, S.H., dated Jun 28, 2007 and 24 Oct 07, concerning among others, increase authorized, Paid up Capital, par value and public offering.
Selengkapnya di halaman PDES →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →