Perbedaan Panca Budi Idaman Tbk. dan Terregra Asia Energy Tbk.: Panca Budi Idaman Tbk. diperdagangkan di Rp525 (kapitalisasi pasar 3,98 T, volume 24 jam 658,2 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Panca Budi Idaman Tbk. jauh lebih besar — sekitar 53,6× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| PBID | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 3,98 T | 74,25 M |
Volume | 658,2 rb | — |
Lot | 6,58 rb | — |
Perputaran | 346,62 jt | — |
Harga Rata-rata | 526,62 | — |
Nilai Transaksi | 346,62 jt | — |
Harga Ekuilibrium Indikatif | 525 | — |
Volume Ekuilibrium Indikatif | 4 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Panca Budi Idaman (The Company) was established by Notarial Deed No.16 dated January 10, 1990 made before Notary Endang Irawati Ekaputri, S.H.,which was amended by Notarial Deed No.3 dated July 2, 1997 made before Notary Jenny Jacinta Lukas, S.H., and Deed No. 10 dated October 17, 1997 made before Notary Kiagus Zainal Arifin, S.H. Panca Budi Group was founded by Djonny Taslim in 1979 who started his career as a general merchant distributing plastic bags made from PP, HDPE and PE. In 1990, Djonny Taslim established PT. Panca Budi Idaman ("the Company") to produce and distribute finished products of plastic bags. The Company commenced its commercial operation by producing plastic bags in 1991.
Selengkapnya di halaman PBID →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →