Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Panorama Sentrawisata Tbk. (PANR) vs Terregra Asia Energy Tbk. (TGRA)

Panorama Sentrawisata Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Panorama Sentrawisata Tbk. dan Terregra Asia Energy Tbk.: Panorama Sentrawisata Tbk. diperdagangkan di Rp424 (kapitalisasi pasar 588,3 M, volume 24 jam 111,8 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Panorama Sentrawisata Tbk. jauh lebih besar — sekitar 7,9× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

PANRTGRA
Kapitalisasi Pasar
588,3 M74,25 M
Volume
111,8 rb
Lot
1,12 rb
Perputaran
46,5 jt
Harga Rata-rata
415,92
Nilai Transaksi
46,5 jt

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

PANR
Lihat detail
TGRA
Lihat detail

Tentang Panorama Sentrawisata Tbk.

PT. Panorama Sentrawisata Tbk (the Company) was established based on Notarial Deed No.71 dated July 22, 1995 and October 1995, of Sugiri Kadarisman, S.H., a public notary in Jakarta. The company has 4 divisions : 1. Inbound tours 2. Outbound Tours and Travel 3. Transportation tours 4. MICE (Meeting, Incentive, Conferences & Exhibition Organizer)

Selengkapnya di halaman PANR

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA