Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Pantai Indah Kapuk Dua Tbk. (PANI) vs Terregra Asia Energy Tbk. (TGRA)

Pantai Indah Kapuk Dua Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Pantai Indah Kapuk Dua Tbk. dan Terregra Asia Energy Tbk.: Pantai Indah Kapuk Dua Tbk. diperdagangkan di Rp5.625 (kapitalisasi pasar 104,59 T, volume 24 jam 7,93 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Pantai Indah Kapuk Dua Tbk. jauh lebih besar — sekitar 1408,6× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

PANITGRA
Kapitalisasi Pasar
104,59 T74,25 M
Volume
7,93 jt
Lot
79,3 rb
Perputaran
44,77 M
Harga Rata-rata
5.645,79
Nilai Transaksi
44,77 M
Harga Ekuilibrium Indikatif
5.625
Volume Ekuilibrium Indikatif
489

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

PANI
Lihat detail
TGRA
Lihat detail

Tentang Pantai Indah Kapuk Dua Tbk.

PT Pratama Abadi Nusa Industri (the Company) was established based on Notarial Deed No. 13 dated September 8, 2000 of Notary Ivonne Barnetha Sinyal, SH.

Selengkapnya di halaman PANI

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA