Perbedaan Minna Padi Investama Sekuritas Tbk. dan Terregra Asia Energy Tbk.: Minna Padi Investama Sekuritas Tbk. diperdagangkan di Rp72 (kapitalisasi pasar 963,38 M, volume 24 jam 101,89 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Minna Padi Investama Sekuritas Tbk. jauh lebih besar — sekitar 13× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| PADI | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 963,38 M | 74,25 M |
Volume | 101,89 jt | — |
Lot | 1,02 jt | — |
Perputaran | 7,25 M | — |
Harga Rata-rata | 71,12 | — |
Nilai Transaksi | 7,25 M | — |
Harga Ekuilibrium Indikatif | 72 | — |
Volume Ekuilibrium Indikatif | 49,96 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Minna Padi Investama Tbk (formerly PT Batavia Artatama Securindo) was established by No Deed. 79 dated May 28, 1998 of Notary Drs. Atrino Leswara, SH. This Deed has been approved by the Ministry of Justice of the Republic of Indonesia in his Decree No. C2-8234.HT 01.01.Th.98 dated July 3, 1998 and was published in the Official Gazette Republic of Indonesia No.. 86 dated October 27, 2006, Supplement. 11489.
Selengkapnya di halaman PADI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →