Perbedaan Optima Prima Metal Sinergi Tbk. dan Terregra Asia Energy Tbk.: Optima Prima Metal Sinergi Tbk. diperdagangkan di Rp116 (kapitalisasi pasar 117 M, volume 24 jam 1,77 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Optima Prima Metal Sinergi Tbk. lebih besar dari sisi kapitalisasi pasar. Mana yang lebih baik tergantung tujuan investasimu.
| OPMS | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 117 M | 74,25 M |
Volume | 1,77 jt | — |
Lot | 17,7 rb | — |
Perputaran | 201,34 jt | — |
Harga Rata-rata | 113,78 | — |
Nilai Transaksi | 201,34 jt | — |
Harga Ekuilibrium Indikatif | 116 | — |
Volume Ekuilibrium Indikatif | 11 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT. Optima Prima Metal Sinergi Tbk (the Company) was established under the name of PT Asian Prima Indosteel based on Notarial Deed No. 02 of Gema Bismantak, S.H., M.Kn. dated September 5, 2012. PT Asian Perkasa Indosteel, a company incorporated in Surabaya, is the immediate and ultimate parent of the Company. The Company started its commercial operation in 2012.
Selengkapnya di halaman OPMS →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →