Perbedaan Indonesia Prima Property Tbk dan Terregra Asia Energy Tbk.: Indonesia Prima Property Tbk diperdagangkan di Rp935 (kapitalisasi pasar 2,81 T, volume 24 jam 7,5 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Indonesia Prima Property Tbk jauh lebih besar — sekitar 37,8× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| OMRE | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 2,81 T | 74,25 M |
Volume | 7,5 rb | — |
Lot | 75 | — |
Perputaran | 6,71 jt | — |
Harga Rata-rata | 894,67 | — |
Nilai Transaksi | 6,71 jt | — |
Harga Ekuilibrium Indikatif | 935 | — |
Volume Ekuilibrium Indikatif | 2 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Indonesia Prima Property Tbk (the Company) was established within the framework of the Domestic Capital Investment Law No. 6 year 1968 as amended by Law No. 12 year 1970 based on notarial deed No. 31 dated April 23, 1983 of Sastra Kosasih, S.H., notary in Surabaya. PT Ometraco Realty, is a member of the Ometraco Group. The company operates in developing and managing apartments, office properties, hotels and shopping centers.
Selengkapnya di halaman OMRE →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →