Perbedaan Bank OCBC NISP Tbk. dan Terregra Asia Energy Tbk.: Bank OCBC NISP Tbk. diperdagangkan di Rp1.265 (kapitalisasi pasar 29,08 T, volume 24 jam 6 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Bank OCBC NISP Tbk. jauh lebih besar — sekitar 391,6× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| NISP | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 29,08 T | 74,25 M |
Volume | 6 jt | — |
Lot | 60 rb | — |
Perputaran | 7,6 M | — |
Harga Rata-rata | 1.267,4 | — |
Nilai Transaksi | 7,6 M | — |
Harga Ekuilibrium Indikatif | 1.265 | — |
Volume Ekuilibrium Indikatif | 5,23 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Bank OCBC NISP Tbk, formerly PT Bank NISP Tbk. Bank NISP was established in 1941 based on deed No. 6 dated April 4, 1941 of notary Theodoor Johan Indewey Gerlings, under the name NV. Nederlandsch Indische Spaar En Deposito Bank (NISP). On May 1995 the bank has raised a US$ 19 million loan, to finance its expanding export credits. On 22 September 2010, the Board of Commissioners and Directors of Bank OCBC NISP and PT Bank OCBC Indonesia (Bank OCBC Indonesia) approved the merger plan related to the merger of Bank OCBC Indonesia into Bank OCBC NISP where Bank OCBC NISP will become the surviving Bank. The effective date of the merger of the Bank with PT Bank OCBC Indonesia was determined on 1 January 2011 based on Notarial Deed No. 10 dated 9 November 2010 of Fathiah Helmi, SH., notary in Jakarta.
Selengkapnya di halaman NISP →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →