Perbedaan Mayora Indah Tbk. dan Terregra Asia Energy Tbk.: Mayora Indah Tbk. diperdagangkan di Rp1.515 (kapitalisasi pasar 34,21 T, volume 24 jam 23,47 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Mayora Indah Tbk. jauh lebih besar — sekitar 460,7× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| MYOR | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 34,21 T | 74,25 M |
Volume | 23,47 jt | — |
Lot | 234,67 rb | — |
Perputaran | 35,38 M | — |
Harga Rata-rata | 1.507,67 | — |
Nilai Transaksi | 35,38 M | — |
Harga Ekuilibrium Indikatif | 1.515 | — |
Volume Ekuilibrium Indikatif | 3,97 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Mayora Indah Tbk (the Company) was established on February 17, 1977 is well known as one of the largest domestic manufacturers and producers of processed food in Indonesia. It was listed on the Jakarta and Surabaya Stock Exchange in May 1990. PT Mayora and its subsidiaries produce variety of consumer foods such as biscuits, wafers, candies, chocolate products, cocoa and coffee products.
Selengkapnya di halaman MYOR →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →