Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Meta Epsi Tbk. (MTPS) vs Terregra Asia Energy Tbk. (TGRA)

Meta Epsi Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Meta Epsi Tbk. dan Terregra Asia Energy Tbk.: Meta Epsi Tbk. diperdagangkan di Rp55 (kapitalisasi pasar 85,48 M, volume 24 jam 13,78 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Meta Epsi Tbk. lebih besar dari sisi kapitalisasi pasar. Mana yang lebih baik tergantung tujuan investasimu.

MTPSTGRA
Kapitalisasi Pasar
85,48 M74,25 M
Volume
13,78 jt
Lot
137,84 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

MTPS
Lihat detail
TGRA
Lihat detail

Tentang Meta Epsi Tbk.

PT Meta Epsi Tbk ("Company") was established based on deed No. 14 dated May 16, 1975 made before Imas Fatimah, S.H. The deed was approved by the Minister of Justice of the Republic of Indonesia through Decree No. Y.A5 / 265/20 dated August 2, 1975 and announced in the State Gazette No. 70 dated August 3, 1979, No. 439 1979. The company began commercial operations in 1975. PT Central Energi Pratama is the company's parent company and the company's last holding company. In 2018, the Company releases all shares in all Subsidiaries owned by the Company, namely PT Andira Agro Tbk, PT Mesa Inti Kebun, PT Meta Epsi Minatara, PT Mahesa Engineers and Constructor and Isakuake Ltd. Release of all shares in all Subsidiaries owned by the Company are carried out through the transfer of shares from the Company to PT Central Energi Pratama.

Selengkapnya di halaman MTPS

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA