Perbedaan Megapower Makmur Tbk. dan IMC Pelita Logistik Tbk.: Megapower Makmur Tbk. diperdagangkan di Rp97 (kapitalisasi pasar 77,61 M, volume 24 jam 7,37 jt), sedangkan IMC Pelita Logistik Tbk. diperdagangkan di Rp314 (kapitalisasi pasar 1,71 T, volume 24 jam 42,2 rb). Perbedaan utamanya: IMC Pelita Logistik Tbk. jauh lebih besar — sekitar 22× kapitalisasi pasar Megapower Makmur Tbk., dan Megapower Makmur Tbk. lebih aktif diperdagangkan (7,37 jt vs 42,2 rb). Mana yang lebih baik tergantung tujuan investasimu.
| MPOW | PSSI | |
|---|---|---|
Kapitalisasi Pasar | 77,61 M | 1,71 T |
Volume | 7,37 jt | 42,2 rb |
Lot | 73,66 rb | 422 |
Perputaran | 718,38 jt | 13,42 jt |
Harga Rata-rata | 97,52 | 318,11 |
Nilai Transaksi | 718,38 jt | 13,42 jt |
Harga Ekuilibrium Indikatif | 97 | 316 |
Volume Ekuilibrium Indikatif | 1,64 rb | 600 |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Megapower Makmur Tbk (the Company) was established based on notarial deed No. 05 dated August 1, 2007 and amended with deed No. 160 dated September 19, 2007, both made in front of Ms. Rose Takarina, S.H., notary in Jakarta. In 2010, Megapower Makmur had acquired by Bina Puri Holdings Bhd and start investing through Power plant in one of the Indonesia shortage of electricity area. In 2012, Megapower Makmur totally has become an Indonesia IPP (Independent Power Producer) Company. Megapower Makmur currently is a subsidiary of Bina Puri Holdings Bhd, a public company listed on the main board of Bursa Malaysia Berhad, with 40 years of work experience in the field of civil construction and the building of both local and international.
Selengkapnya di halaman MPOW →PT Pelita Samudera Shipping (the Company) was established based on Notarial Deed No. 20 of Sutjipto, S.H., a notary in Jakarta, dated 10 January 2007, which was amended by Notarial Deed No.127 of Sutjipto, S.H. dated 16 April 2007. The Company obtained an approval to become a Foreign Capital Investment Company (“PMA”) from the Indonesian Investment Coordinating Board (“BKPM”)under decision letter No. 213/V/PMA/2009 dated 21 October 2009.
Selengkapnya di halaman PSSI →