Perbedaan Bank Multiarta Sentosa Tbk. dan Terregra Asia Energy Tbk.: Bank Multiarta Sentosa Tbk. diperdagangkan di Rp3.360 (kapitalisasi pasar 4,7 T, volume 24 jam 10 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Bank Multiarta Sentosa Tbk. jauh lebih besar — sekitar 63,3× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| MASB | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 4,7 T | 74,25 M |
Volume | 10 rb | — |
Lot | 100 | — |
Perputaran | 33,47 jt | — |
Harga Rata-rata | 3.347 | — |
Nilai Transaksi | 33,47 jt | — |
Harga Ekuilibrium Indikatif | 3.230 | — |
Volume Ekuilibrium Indikatif | 10 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Bank Multiarta Sentosa Tbk (the Bank) was established by Deed No.201 dated July 28, 1992 of H.Saidus Sjahar, S.H. The Bank's parent company is PT Danabina Sentana which is the majority stockholder of the Bank. The majority shareholder of PT Danabina Sentana is PT Lumbung Artakencana which is a company established in Indonesia and the Bank’s ultimate shareholder that joined in business group of Wings Group.
Selengkapnya di halaman MASB →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →