Perbedaan Star Pacific Tbk dan Terregra Asia Energy Tbk.: Star Pacific Tbk diperdagangkan di Rp236 (kapitalisasi pasar 276,22 M, volume 24 jam 309,9 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Star Pacific Tbk jauh lebih besar — sekitar 3,7× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| LPLI | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 276,22 M | 74,25 M |
Volume | 309,9 rb | — |
Lot | 3,1 rb | — |
Perputaran | 73,14 jt | — |
Harga Rata-rata | 236 | — |
Nilai Transaksi | 73,14 jt | — |
Harga Ekuilibrium Indikatif | 236 | — |
Volume Ekuilibrium Indikatif | 8 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Star Pacific Tbk (the Company), was established under the name of PT Asuransi Lippo Jiwa Sakti based on Deed No. 301 dated May 28, 1983 of Misahardi Wilamarta, S.H., a notary in Jakarta, which was amended by Deed No. 130 dated August 10, 1983 by the same notary, concerning the change of the Company's name to PT Asuransi Lippo Life. Furthermore, the Company's name was again changed to Lippo E-Net Tbk based on Deed No. 87 dated June 23, 2000 of Misahardi Wilamarta, S.H., a notary in Jakarta.
Selengkapnya di halaman LPLI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →