Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Green Power Group Tbk. (LABA) vs Terregra Asia Energy Tbk. (TGRA)

Green Power Group Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Green Power Group Tbk. dan Terregra Asia Energy Tbk.: Green Power Group Tbk. diperdagangkan di Rp124 (kapitalisasi pasar 143,44 M, volume 24 jam 18,78 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Green Power Group Tbk. lebih besar dari sisi kapitalisasi pasar. Mana yang lebih baik tergantung tujuan investasimu.

LABATGRA
Kapitalisasi Pasar
143,44 M74,25 M
Volume
18,78 jt
Lot
187,76 rb
Perputaran
2,32 M
Harga Rata-rata
123,35
Nilai Transaksi
2,32 M
Harga Ekuilibrium Indikatif
124
Volume Ekuilibrium Indikatif
3,05 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

LABA
Lihat detail
TGRA
Lihat detail

Tentang Green Power Group Tbk.

PT Ladangbaja Murni Tbk. (the "Company") was established based on Notarial Deed No. 1 dated December 6, 1989, which was made by Notary Linda Ibrahim, SH. The company began its commercial activities in 1990.

Selengkapnya di halaman LABA

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA