Perbedaan Perdana Bangun Pusaka Tbk dan Terregra Asia Energy Tbk.: Perdana Bangun Pusaka Tbk diperdagangkan di Rp2.070 (kapitalisasi pasar 661,44 M, volume 24 jam 30,6 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Perdana Bangun Pusaka Tbk jauh lebih besar — sekitar 8,9× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| KONI | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 661,44 M | 74,25 M |
Volume | 30,6 rb | — |
Lot | 306 | — |
Perputaran | 66,04 jt | — |
Harga Rata-rata | 2.158,17 | — |
Nilai Transaksi | 66,04 jt | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT. Perdana Bangun Persaka Tbk conducting business in the field of photography trade business and its equipment, and capital participation in its affiliates. The company is established in 1987 and registered at the Jakarta Stock Exchange since 1995 and a sole distributor of photography products produced by Konica Corporation, Japan. Product marketed by the company are as follows: KONICA color film and photography paper, KONICA photo printing machine, KONIKA X-ray film and chemicals for photography of KONICA trade mark.
Selengkapnya di halaman KONI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →