Perbedaan Resource Alam Indonesia Tbk dan Krakatau Steel (Persero) Tbk.: Resource Alam Indonesia Tbk diperdagangkan di Rp278 (kapitalisasi pasar 1,36 T, volume 24 jam 3,94 jt), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp230 (kapitalisasi pasar 4,33 T, volume 24 jam 5,43 jt). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. jauh lebih besar — sekitar 3,2× kapitalisasi pasar Resource Alam Indonesia Tbk, dan Krakatau Steel (Persero) Tbk. lebih aktif diperdagangkan (5,43 jt vs 3,94 jt). Mana yang lebih baik tergantung tujuan investasimu.
| KKGI | KRAS | |
|---|---|---|
Kapitalisasi Pasar | 1,36 T | 4,33 T |
Volume | 3,94 jt | 5,43 jt |
Lot | 39,35 rb | 54,27 rb |
Perputaran | 1,09 M | 1,24 M |
Harga Rata-rata | 277,35 | 228,12 |
Nilai Transaksi | 1,09 M | 1,24 M |
Harga Ekuilibrium Indikatif | 278 | 230 |
Volume Ekuilibrium Indikatif | 65 | 3,53 rb |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Resource Alam Indonesia Tbk (the Company) was originally established under the name PT Kurnia Kapuas Utama Glue Industries (which was subsequently changed to PT Kurnia Kapuas Utama Tbk). PT Kurnia Kapuas Glue industries founded in 1981 in Pontianak, West Kalimantan and produces formalin and resin. The company supplies glue for plywood factories within the Bumi Raya Utama Group (BRU Group). The company is domestic investment.
Selengkapnya di halaman KKGI →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Selengkapnya di halaman KRAS →