Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Kusuma Kemindo Sentosa Tbk. (KKES) vs Terregra Asia Energy Tbk. (TGRA)

Kusuma Kemindo Sentosa Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Kusuma Kemindo Sentosa Tbk. dan Terregra Asia Energy Tbk.: Kusuma Kemindo Sentosa Tbk. diperdagangkan di Rp89 (kapitalisasi pasar 136,5 M, volume 24 jam 20,67 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Kusuma Kemindo Sentosa Tbk. lebih besar dari sisi kapitalisasi pasar. Mana yang lebih baik tergantung tujuan investasimu.

KKESTGRA
Kapitalisasi Pasar
136,5 M74,25 M
Volume
20,67 jt
Lot
206,71 rb
Perputaran
1,8 M
Harga Rata-rata
87,3
Nilai Transaksi
1,8 M
Harga Ekuilibrium Indikatif
89
Volume Ekuilibrium Indikatif
3,04 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

KKES
Lihat detail
TGRA
Lihat detail

Tentang Kusuma Kemindo Sentosa Tbk.

PT Kusuma Kemindo Sentosa Tbk (the Company) was established based on Notarial Deed No. 78 dated November 9, 1990 and amended by Deed No. 64 dated September 16, 1991, both were madebefore Notary James Herman Rahardjo, S.H., Notary in Jakarta.

Selengkapnya di halaman KKES

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA