Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja KMI Wire Cable Tbk (KBLI) vs Cikarang Listrindo Tbk. (POWR)

KMI Wire Cable TbkTrading
Cikarang Listrindo Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan KMI Wire Cable Tbk dan Cikarang Listrindo Tbk.: KMI Wire Cable Tbk diperdagangkan di Rp324 (kapitalisasi pasar 1,31 T, volume 24 jam 1,42 jt), sedangkan Cikarang Listrindo Tbk. diperdagangkan di Rp805 (kapitalisasi pasar 13,27 T, volume 24 jam 9,17 jt). Perbedaan utamanya: Cikarang Listrindo Tbk. jauh lebih besar — sekitar 10,1× kapitalisasi pasar KMI Wire Cable Tbk, dan Cikarang Listrindo Tbk. lebih aktif diperdagangkan (9,17 jt vs 1,42 jt). Mana yang lebih baik tergantung tujuan investasimu.

KBLIPOWR
Kapitalisasi Pasar
1,31 T13,27 T
Volume
1,42 jt9,17 jt
Lot
14,15 rb91,71 rb
Perputaran
459,78 jt7,36 M
Harga Rata-rata
324,88802,87
Nilai Transaksi
459,78 jt7,36 M
Harga Ekuilibrium Indikatif
324805
Volume Ekuilibrium Indikatif
12,11 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

KBLI
Lihat detail
POWR
Lihat detail

Tentang KMI Wire Cable Tbk

PT KMI Wire and Cable Tbk (the Company) formerly PT. GT Kabel Indonesia is one of the largest telecommunications and power cable producer. It is owned 53% by Gadjah Tunggal Group. It was established in 1972 by Electro GmbH of Germany (today known as Alcatel Kabelmetal) and PT Gunung Ngadeg Djaya.The Company was established wtihin the framework of the Foreign Capital Investment Law No. 1 year 1967 as amended by Law No. 11 year 1970, based on deed No. 42 dated January 19, 1972 of Djojo Muljadi, SH, notary in Jakarta

Selengkapnya di halaman KBLI

Tentang Cikarang Listrindo Tbk.

PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.

Selengkapnya di halaman POWR