Perbedaan Isra Presisi Indonesia Tbk. dan Terregra Asia Energy Tbk.: Isra Presisi Indonesia Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 112,57 M, volume 24 jam 68,52 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Isra Presisi Indonesia Tbk. lebih besar dari sisi kapitalisasi pasar. Mana yang lebih baik tergantung tujuan investasimu.
| ISAP | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 112,57 M | 74,25 M |
Volume | 68,52 jt | — |
Lot | 685,23 rb | — |
Perputaran | 1,86 M | — |
Harga Rata-rata | 27,16 | — |
Nilai Transaksi | 1,86 M | — |
Harga Ekuilibrium Indikatif | 27 | — |
Volume Ekuilibrium Indikatif | 13,68 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Isra Presisi Indonesia Tbk ("The Company") was established on October 22, 2011 based on Notary Deed No. 47 of Evi Nursamsiyati, S.H. The Company started its commercial operations in2011.
Selengkapnya di halaman ISAP →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →