Perbedaan Indonesia Kendaraan Terminal Tbk dan Terregra Asia Energy Tbk.: Indonesia Kendaraan Terminal Tbk diperdagangkan di Rp1.125 (kapitalisasi pasar 2,05 T, volume 24 jam 770 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Indonesia Kendaraan Terminal Tbk jauh lebih besar — sekitar 27,6× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| IPCC | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 2,05 T | 74,25 M |
Volume | 770 rb | — |
Lot | 7,7 rb | — |
Perputaran | 864,05 jt | — |
Harga Rata-rata | 1.122,14 | — |
Nilai Transaksi | 864,05 jt | — |
Harga Ekuilibrium Indikatif | 1.125 | — |
Volume Ekuilibrium Indikatif | 20 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Indonesia Kendaraan Terminal Tbk (“the Company”) was established based on November 05, 2012 by deed No. 10 of Yulianti Irawati SH., substitute of Nur Muhammad Dipo Nusantara Pua Upa, S.H., M.Kn., Notary in Jakarta. Prior to becoming a separate business entity, PT Indonesia Vehicle Terminal was only a strategic business unit called Tanjung Priok Car Terminal (TPT) under its Head Office and operated since June 2007.
Selengkapnya di halaman IPCC →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →