Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Indocement Tunggal Prakarsa Tbk (INTP) vs Terregra Asia Energy Tbk. (TGRA)

Indocement Tunggal Prakarsa TbkTrading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Indocement Tunggal Prakarsa Tbk dan Terregra Asia Energy Tbk.: Indocement Tunggal Prakarsa Tbk diperdagangkan di Rp5.200 (kapitalisasi pasar 17,93 T, volume 24 jam 743,8 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Indocement Tunggal Prakarsa Tbk jauh lebih besar — sekitar 241,5× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

INTPTGRA
Kapitalisasi Pasar
17,93 T74,25 M
Volume
743,8 rb
Lot
7,44 rb
Perputaran
3,88 M
Harga Rata-rata
5.212,52
Nilai Transaksi
3,88 M
Harga Ekuilibrium Indikatif
5.200
Volume Ekuilibrium Indikatif
735

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

INTP
Lihat detail
TGRA
Lihat detail

Tentang Indocement Tunggal Prakarsa Tbk

PT Indocement Tungggal Prakarsa Tbk (The company) was incorporated in Indonesia on January 16, 1985 and the Ministry of Justice approved its deed of incorporation on May 17, 1985. The company’s articles of association have been amended from time to time, the latest of which was covered by notarial deed on august 21, 1997. The amendments made are primarily intended to align the company’s articles of association with the new corporate law No. 1 year 1995. The company started its commercial operations in 1985. the company is domiciled in Jakarta, while its factories are located in Citeureup and Cirebon, West Java. The company and its subsidiaries were a multibusiness group divided into Cement Business as the Group core business, and Other business. The Cement business mainly includes the operation of the eight integrated cement plants at its Citeureup-Bogor site, two integrated cement plants at its Palimanan - Cirebon site with a combined annual capacity of 10.9 million tons, consisting of 10.7 million tons of portland cement and 0.2 million tons of specialty (white and oil well) cements, and its ready mix concrete manufacturing subsudiary. Other business includes, among others, the operations of the company-owned property, Wisma Indosemen, a 23 storey office tower building with over 19,000 square meters of rentable space and two basement car parks and PT Wisma Nusantara International, an equitized subsidiary which owns and operates a 30 storey office building with 26,108 square meters of rentable space and President Hotel, a four star Hotel with 315 rooms. The above mentioned building are located in Jakarta’s central commercial district.

Selengkapnya di halaman INTP

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA