Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Indocement Tunggal Prakarsa Tbk (INTP) vs Kabelindo Murni Tbk (KBLM)

Indocement Tunggal Prakarsa TbkTrading
Kabelindo Murni TbkTrading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Indocement Tunggal Prakarsa Tbk dan Kabelindo Murni Tbk: Indocement Tunggal Prakarsa Tbk diperdagangkan di Rp5.275 (kapitalisasi pasar 18,27 T, volume 24 jam 285,4 rb), sedangkan Kabelindo Murni Tbk diperdagangkan di Rp304 (kapitalisasi pasar 340,48 M, volume 24 jam 300). Perbedaan utamanya: Indocement Tunggal Prakarsa Tbk jauh lebih besar — sekitar 53,7× kapitalisasi pasar Kabelindo Murni Tbk, dan Indocement Tunggal Prakarsa Tbk lebih aktif diperdagangkan (285,4 rb vs 300). Mana yang lebih baik tergantung tujuan investasimu.

INTPKBLM
Kapitalisasi Pasar
18,27 T340,48 M
Volume
285,4 rb300
Lot
2,85 rb3
Perputaran
1,51 M91,6 rb
Harga Rata-rata
5.286,85305,33
Nilai Transaksi
1,51 M91,6 rb
Harga Ekuilibrium Indikatif
5.350306
Volume Ekuilibrium Indikatif
262

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

INTP
Lihat detail
KBLM
Lihat detail

Tentang Indocement Tunggal Prakarsa Tbk

PT Indocement Tungggal Prakarsa Tbk (The company) was incorporated in Indonesia on January 16, 1985 and the Ministry of Justice approved its deed of incorporation on May 17, 1985. The company’s articles of association have been amended from time to time, the latest of which was covered by notarial deed on august 21, 1997. The amendments made are primarily intended to align the company’s articles of association with the new corporate law No. 1 year 1995. The company started its commercial operations in 1985. the company is domiciled in Jakarta, while its factories are located in Citeureup and Cirebon, West Java. The company and its subsidiaries were a multibusiness group divided into Cement Business as the Group core business, and Other business. The Cement business mainly includes the operation of the eight integrated cement plants at its Citeureup-Bogor site, two integrated cement plants at its Palimanan - Cirebon site with a combined annual capacity of 10.9 million tons, consisting of 10.7 million tons of portland cement and 0.2 million tons of specialty (white and oil well) cements, and its ready mix concrete manufacturing subsudiary. Other business includes, among others, the operations of the company-owned property, Wisma Indosemen, a 23 storey office tower building with over 19,000 square meters of rentable space and two basement car parks and PT Wisma Nusantara International, an equitized subsidiary which owns and operates a 30 storey office building with 26,108 square meters of rentable space and President Hotel, a four star Hotel with 315 rooms. The above mentioned building are located in Jakarta’s central commercial district.

Selengkapnya di halaman INTP

Tentang Kabelindo Murni Tbk

PT Kabelindo Murni Tbk (the Company) was established based on Notarial Deed No. 71 dated October 11, 1979 of Fredrik Alexander Tumbuan, S.H. PT Kabelindo Murni Tbk manufactures cable and cable fittings using raw materials such as polyethylene and heat shrinkable materials tubes. Installed production capacity has reached 26,000 tons of power cables and 1,330,000 Km pair of telephone cables.

Selengkapnya di halaman KBLM