Perbedaan Inti Bangun Sejahtera Tbk. dan Trias Sentosa Tbk.: Inti Bangun Sejahtera Tbk. diperdagangkan di Rp8.475 (kapitalisasi pasar 11,45 T), sedangkan Trias Sentosa Tbk. diperdagangkan di Rp462 (kapitalisasi pasar 1,3 T, volume 24 jam 65,4 rb). Perbedaan utamanya: Inti Bangun Sejahtera Tbk. jauh lebih besar — sekitar 8,8× kapitalisasi pasar Trias Sentosa Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| IBST | TRST | |
|---|---|---|
Kapitalisasi Pasar | 11,45 T | 1,3 T |
Volume | — | 65,4 rb |
Lot | — | 654 |
Perputaran | — | 30,18 jt |
Harga Rata-rata | — | 461,54 |
Nilai Transaksi | — | 30,18 jt |
Harga Ekuilibrium Indikatif | — | 462 |
Volume Ekuilibrium Indikatif | — | 435 |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Inti Bangun Sejahtera Tbk formerly PT Inti Build Prosperous Tbk was established based on Notarial Deed No. 7 dated 28 April 2006 of Yulia, S.H., a notary in Jakarta.At first PT Inti Build Prosperous, Tbk provide signal amplification in buildings (in building system solution). Since the year 2009, PT Inti Build Prosperity has been providing telecommunication infrastructure such as telecommunications tower (tower providers) to meet the needs of mobile telecom operators in Indonesia. And at this time (July 2012) PT Inti Build Prosperity has 1.989 telecommunications tower.Currently, PT Inti Build Prosperous, Tbk provides services for several telecom operators, such as Smart Telecom, Indosat, Telkomsel, XL Axiata, Telkom Flexi, NTS, HCPT, Bakrie Telecom, through leasing tower spread throughout Indonesia.
Selengkapnya di halaman IBST →PT Trias Sentosa Tbk was established on November 23, 1979 and started commercial operation in 1984 with total capacity of 4.500 tons BOPP (biaxially oriented polypropylene) film per annum. In 1989, the Company completed expansion of its second line BOPP film with capacity of 7.500 tons per annum. In 1993, the Company completed its expansion of third line BOPP film with capacity of 12.000 tons per annum, and in 1995, Polyester film project with total capacity of 12.000 tons were completed. In 1996, the Company completed its expansion of fourth line BOPP film with total capacity of 16.000 tons. Currently, the Company is the largest BOPP Film and Polyester Film producer in Indonesia.
Selengkapnya di halaman TRST →