Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Gunanusa Eramandiri Tbk. (GUNA) vs Terregra Asia Energy Tbk. (TGRA)

Gunanusa Eramandiri Tbk.Trading
Terregra Asia Energy Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Gunanusa Eramandiri Tbk. dan Terregra Asia Energy Tbk.: Gunanusa Eramandiri Tbk. diperdagangkan di Rp220 (kapitalisasi pasar 550 M, volume 24 jam 73,5 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Gunanusa Eramandiri Tbk. jauh lebih besar — sekitar 7,4× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.

GUNATGRA
Kapitalisasi Pasar
550 M74,25 M
Volume
73,5 rb
Lot
735
Perputaran
15,97 jt
Harga Rata-rata
217,24
Nilai Transaksi
15,97 jt
Harga Ekuilibrium Indikatif
220
Volume Ekuilibrium Indikatif
10

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

GUNA
Lihat detail
TGRA
Lihat detail

Tentang Gunanusa Eramandiri Tbk.

PT Gunanusa Eramandiri Tbk (the Company) was established based on Notarial deed of Lasma Batubara, S.H., No. 60 dated August 5, 1993. The Company started its commercial operation in August 1993.

Selengkapnya di halaman GUNA

Tentang Terregra Asia Energy Tbk.

PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.

Selengkapnya di halaman TGRA