Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Gunanusa Eramandiri Tbk. (GUNA) vs Greenwood Sejahtera Tbk. (GWSA)

Gunanusa Eramandiri Tbk.Trading
Greenwood Sejahtera Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Gunanusa Eramandiri Tbk. dan Greenwood Sejahtera Tbk.: Gunanusa Eramandiri Tbk. diperdagangkan di Rp222 (kapitalisasi pasar 510 M, volume 24 jam 2,43 jt), sedangkan Greenwood Sejahtera Tbk. diperdagangkan di Rp141 (kapitalisasi pasar 1,08 T, volume 24 jam 35,6 rb). Perbedaan utamanya: Greenwood Sejahtera Tbk. jauh lebih besar — sekitar 2,1× kapitalisasi pasar Gunanusa Eramandiri Tbk., dan Gunanusa Eramandiri Tbk. lebih aktif diperdagangkan (2,43 jt vs 35,6 rb). Mana yang lebih baik tergantung tujuan investasimu.

GUNAGWSA
Kapitalisasi Pasar
510 M1,08 T
Volume
2,43 jt35,6 rb
Lot
24,33 rb356
Perputaran
526,73 jt4,95 jt
Harga Rata-rata
216,46139,07
Nilai Transaksi
526,73 jt4,95 jt
Harga Ekuilibrium Indikatif
204138
Volume Ekuilibrium Indikatif
10087

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

GUNA
Lihat detail
GWSA
Lihat detail

Tentang Gunanusa Eramandiri Tbk.

PT Gunanusa Eramandiri Tbk (the Company) was established based on Notarial deed of Lasma Batubara, S.H., No. 60 dated August 5, 1993. The Company started its commercial operation in August 1993.

Selengkapnya di halaman GUNA

Tentang Greenwood Sejahtera Tbk.

Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.

Selengkapnya di halaman GWSA