Perbedaan Aman Agrindo Tbk. dan Terregra Asia Energy Tbk.: Aman Agrindo Tbk. diperdagangkan di Rp845 (kapitalisasi pasar 866,99 M, volume 24 jam 27,72 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Aman Agrindo Tbk. jauh lebih besar — sekitar 11,7× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| GULA | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 866,99 M | 74,25 M |
Volume | 27,72 jt | — |
Lot | 277,21 rb | — |
Perputaran | 23 M | — |
Harga Rata-rata | 829,89 | — |
Nilai Transaksi | 23 M | — |
Harga Ekuilibrium Indikatif | 845 | — |
Volume Ekuilibrium Indikatif | 3,66 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Aman Agrindo Tbk (the "Company") was established based on a Notarial Deed No. 73 dated May 24, 2013, of Agustinus Andi Toryanto S.H., Sp.N., M.Kn., Notary in Semarang.
Selengkapnya di halaman GULA →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →