Perbedaan Equity Development Investment Tbk. dan Krakatau Steel (Persero) Tbk.: Equity Development Investment Tbk. diperdagangkan di Rp84 (kapitalisasi pasar 1,31 T, volume 24 jam 2,37 jt), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp228 (kapitalisasi pasar 4,33 T, volume 24 jam 2,2 jt). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. jauh lebih besar — sekitar 3,3× kapitalisasi pasar Equity Development Investment Tbk., dan Equity Development Investment Tbk. lebih aktif diperdagangkan (2,37 jt vs 2,2 jt). Mana yang lebih baik tergantung tujuan investasimu.
| GSMF | KRAS | |
|---|---|---|
Kapitalisasi Pasar | 1,31 T | 4,33 T |
Volume | 2,37 jt | 2,2 jt |
Lot | 23,75 rb | 21,96 rb |
Perputaran | 198,8 jt | 491,58 jt |
Harga Rata-rata | 83,71 | 223,89 |
Nilai Transaksi | 198,8 jt | 491,58 jt |
Harga Ekuilibrium Indikatif | 85 | 224 |
Volume Ekuilibrium Indikatif | 6,5 rb | 15,8 rb |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Equity Development Investment Tbk (the “Company”) was established in Jakarta under the name of PT Gajah Surya Arta Leasing on November 1, 1982 based on the Notarial Deed of Didi Sudjadi, S.H., No. 1, as amended by deed No. 30 dated March 6, 1985 of the same notary. The Company changed its name to be PT BDNI Capital Corporation Tbk. On February 7, 2001, it changed the named again to be PT GT Investama Kapital, Tbk.
Selengkapnya di halaman GSMF →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Selengkapnya di halaman KRAS →