Perbedaan Intra Golflink Resorts Tbk. dan Terregra Asia Energy Tbk.: Intra Golflink Resorts Tbk. diperdagangkan di Rp180 (kapitalisasi pasar 3,43 T, volume 24 jam 37,54 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Intra Golflink Resorts Tbk. jauh lebih besar — sekitar 46,2× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| GOLF | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 3,43 T | 74,25 M |
Volume | 37,54 jt | — |
Lot | 375,36 rb | — |
Perputaran | 6,84 M | — |
Harga Rata-rata | 182,24 | — |
Nilai Transaksi | 6,84 M | — |
Harga Ekuilibrium Indikatif | 180 | — |
Volume Ekuilibrium Indikatif | 3,11 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Intra Golflink Resorts Tbk (the Company) was established under the name of PT Dreamland Pecatu Golf based on Notarial Deed No. 32 dated February 22, 2005 of Robert Purba, S.H., notary in Jakarta. The Company started its commercial operations in June 2006. The Company immediate and ultimate parent entity is PT Bali Pecatu Graha, domiciled in Bali. H. Hutomo Mandala Putra, S.H., is the ultimate beneficial owner and controlling party of the Company.
Selengkapnya di halaman GOLF →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →