Perbedaan Garuda Maintenance Facility Aero Asia Tbk. dan Terregra Asia Energy Tbk.: Garuda Maintenance Facility Aero Asia Tbk. diperdagangkan di Rp58 (kapitalisasi pasar 7,12 T, volume 24 jam 61,66 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Garuda Maintenance Facility Aero Asia Tbk. jauh lebih besar — sekitar 95,9× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| GMFI | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 7,12 T | 74,25 M |
Volume | 61,66 jt | — |
Lot | 616,63 rb | — |
Perputaran | 3,52 M | — |
Harga Rata-rata | 57,03 | — |
Nilai Transaksi | 3,52 M | — |
Harga Ekuilibrium Indikatif | 58 | — |
Volume Ekuilibrium Indikatif | 17,24 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
Starting out in 1949, GMF AeroAsia originated as the Technical Division of Garuda Indonesia Airlines at the Kemayoran and Halim Perdanakusuma airports in Jakarta, Indonesia. In 1984, GMF AeroAsia was relocated to Soekarno-Hatta International Airport and rebranded itself as the Division of Maintenance & Engineering (M & E), which eventually developed into an independent business unit.Subsequently in 1998, the M & E Division transformed into the Strategic Business Unit (SBU-GMF), handling all Garuda Indonesia's fleet maintenance activities, thus honing its competitive edge. Eventually in 2002 SBU-GMF was spun off from Garuda Indonesia, and officially became an independent entity under the name of PT Garuda Maintenance Facility Aero Asia.GMF AeroAsia is now rightly considered as the best and biggest aircraft maintenance companies in the region, providing the excellence of integrated solutions for all customers around the world.PT. Garuda Maintenance Facility Aero Asia Tbk (the Company) was established based on deed No. 93 dated April 26, 2002 of Arry Supratno, SH, notary in Jakarta.
Selengkapnya di halaman GMFI →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →