Perbedaan Gunung Raja Paksi Tbk. dan Krakatau Steel (Persero) Tbk.: Gunung Raja Paksi Tbk. diperdagangkan di Rp296 (kapitalisasi pasar 3,56 T, volume 24 jam 344,8 rb), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp224 (kapitalisasi pasar 4,41 T, volume 24 jam 10,07 jt). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. lebih besar dari sisi kapitalisasi pasar, dan Krakatau Steel (Persero) Tbk. lebih aktif diperdagangkan (10,07 jt vs 344,8 rb). Mana yang lebih baik tergantung tujuan investasimu.
| GGRP | KRAS | |
|---|---|---|
Kapitalisasi Pasar | 3,56 T | 4,41 T |
Volume | 344,8 rb | 10,07 jt |
Lot | 3,45 rb | 100,67 rb |
Perputaran | 101,61 jt | 2,28 M |
Harga Rata-rata | 294,7 | 226,43 |
Nilai Transaksi | 101,61 jt | 2,28 M |
Harga Ekuilibrium Indikatif | 296 | 224 |
Volume Ekuilibrium Indikatif | 15 | 3,88 rb |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT. Gunung Raja Paksi Tbk (the Company) was established under the name of PT Gunung Naga Mas based on Notarial Deed No.229 of Chairani Bustami,S.H. dated August 20,1990 that was amended by Notarial Deed No.25 dated June 6,1991. The change from Foreign Capital Investment (“FCI”) to Domestic Capital Investment (“DCI”) has been approved by the Capital Investment Coordinating Board of the Republic of Indonesia in its Letter No.346/1/IP/PMDN/2016 dated December 15, 2016.
Selengkapnya di halaman GGRP →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Selengkapnya di halaman KRAS →