Perbedaan Eratex Djaja Tbk. dan Terregra Asia Energy Tbk.: Eratex Djaja Tbk. diperdagangkan di Rp181 (kapitalisasi pasar 239,3 M, volume 24 jam 594,1 rb), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Eratex Djaja Tbk. jauh lebih besar — sekitar 3,2× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| ERTX | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 239,3 M | 74,25 M |
Volume | 594,1 rb | — |
Lot | 5,94 rb | — |
Perputaran | 108,21 jt | — |
Harga Rata-rata | 182,14 | — |
Nilai Transaksi | 108,21 jt | — |
Harga Ekuilibrium Indikatif | 181 | — |
Volume Ekuilibrium Indikatif | 864 | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Eratex Djaja Tbk (the "Entity") was established in the framework of Foreign Capital Investment Law No.1, 1967 by Notarial Deed No.7 dated October 12, 1972 based on Deed prepared by Koerniatini Karim, Public Notary in Jakarta. Founded in 1972 as a joint venture company between PT Private Development Finance Company of Indonesia Ltd. and Limmen Investment Ltd., Unisouh Holding Ltd., Eastern Cotton Mills Ltd. Yarn spinning factory was built in 1973 on 17 ha of land in Probolinggo.
Selengkapnya di halaman ERTX →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →