Perbedaan Elnusa Tbk. dan Terregra Asia Energy Tbk.: Elnusa Tbk. diperdagangkan di Rp725 (kapitalisasi pasar 5,33 T, volume 24 jam 33,14 jt), sedangkan Terregra Asia Energy Tbk. diperdagangkan di Rp27 (kapitalisasi pasar 74,25 M). Perbedaan utamanya: Elnusa Tbk. jauh lebih besar — sekitar 71,8× kapitalisasi pasar Terregra Asia Energy Tbk.. Mana yang lebih baik tergantung tujuan investasimu.
| ELSA | TGRA | |
|---|---|---|
Kapitalisasi Pasar | 5,33 T | 74,25 M |
Volume | 33,14 jt | — |
Lot | 331,38 rb | — |
Perputaran | 24,44 M | — |
Harga Rata-rata | 737,47 | — |
Nilai Transaksi | 24,44 M | — |
Harga Ekuilibrium Indikatif | 725 | — |
Volume Ekuilibrium Indikatif | 24,27 rb | — |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Elnusa Tbk (Company) was established under the name of PT Elektronika Nusantara on January 25, 1969 based on notarial deed No.18 of Tan Thong Kie, S.H., dated January 25, 1969, as amended by notarial deed No. 10 of the same notary dated February 13, 1969. The Company’s articles of association has been amended several times, most recently by notarial deed No. 2 of Soegeng Santosa, S.H., dated Jan 7, 2002, concerning among others, the change in the Company’s name and public offering.
Selengkapnya di halaman ELSA →PT Terregra Asia Energy Tbk (the Company) formerly was established (PT Mitra Megatama Perkasa) based on Notarial Deed No. 31 dated November 7, 1995 of T. Francisca Teresa N. S.H., a public notary in Denpasar. The Company was established as a Mechanical and Electrical contractor focusing on the power generating sector, primarily working for PLN, Indonesia’s national electricity company. In 2010, MMP made its first investment in power generation, a mini-hydro plant located in Sumatera. MMP became PT. Terregra Asia Energy in 2016 as it shifted its focus to hydro and solar photo-voltaic power generation. Terregra is now constructing a fleet of hydro-generation power plants and both roof-top and utility scale photo-voltaic developments. Working with proven technologies combined with its own experienced development, power engineering and management professionals as well as its own O&M team and partnering with some of the most experienced renewable power developers and technology providers in the world, Terregra is aiming to have over 300 MW of sustainable generation in operation within the next 5 years.
Selengkapnya di halaman TGRA →