Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Caturkarda Depo Bangunan Tbk. (DEPO) vs Trias Sentosa Tbk. (TRST)

Caturkarda Depo Bangunan Tbk.Trading
Trias Sentosa Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Caturkarda Depo Bangunan Tbk. dan Trias Sentosa Tbk.: Caturkarda Depo Bangunan Tbk. diperdagangkan di Rp244 (kapitalisasi pasar 1,66 T, volume 24 jam 2,75 jt), sedangkan Trias Sentosa Tbk. diperdagangkan di Rp458 (kapitalisasi pasar 1,29 T, volume 24 jam 66,5 rb). Perbedaan utamanya: Caturkarda Depo Bangunan Tbk. lebih besar dari sisi kapitalisasi pasar, dan Caturkarda Depo Bangunan Tbk. lebih aktif diperdagangkan (2,75 jt vs 66,5 rb). Mana yang lebih baik tergantung tujuan investasimu.

DEPOTRST
Kapitalisasi Pasar
1,66 T1,29 T
Volume
2,75 jt66,5 rb
Lot
27,45 rb665
Perputaran
686,17 jt30,41 jt
Harga Rata-rata
249,97457,29
Nilai Transaksi
686,17 jt30,41 jt
Harga Ekuilibrium Indikatif
242458
Volume Ekuilibrium Indikatif
1054,2 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

DEPO
Lihat detail
TRST
Lihat detail

Tentang Caturkarda Depo Bangunan Tbk.

PT Caturkarda Depo Bangunan Tbk (the “Company”) was established based on Notarial Deed No. 5 dated January 3, 1996 of Public Notary Mrs. Poerbaningsih Adi Warsito, S.H., a Notary in Jakarta. The Company commenced its commercial operations in 1996.

Selengkapnya di halaman DEPO

Tentang Trias Sentosa Tbk.

PT Trias Sentosa Tbk was established on November 23, 1979 and started commercial operation in 1984 with total capacity of 4.500 tons BOPP (biaxially oriented polypropylene) film per annum. In 1989, the Company completed expansion of its second line BOPP film with capacity of 7.500 tons per annum. In 1993, the Company completed its expansion of third line BOPP film with capacity of 12.000 tons per annum, and in 1995, Polyester film project with total capacity of 12.000 tons were completed. In 1996, the Company completed its expansion of fourth line BOPP film with total capacity of 16.000 tons. Currently, the Company is the largest BOPP Film and Polyester Film producer in Indonesia.

Selengkapnya di halaman TRST