Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Citra Tubindo Tbk. (CTBN) vs Petrosea Tbk. (PTRO)

Citra Tubindo Tbk.Trading
Petrosea Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Citra Tubindo Tbk. dan Petrosea Tbk.: Citra Tubindo Tbk. diperdagangkan di Rp5.050 (kapitalisasi pasar 4 T, volume 24 jam 15,5 rb), sedangkan Petrosea Tbk. diperdagangkan di Rp3.970 (kapitalisasi pasar 39,84 T, volume 24 jam 13,21 jt). Perbedaan utamanya: Petrosea Tbk. jauh lebih besar — sekitar 10× kapitalisasi pasar Citra Tubindo Tbk., dan Petrosea Tbk. lebih aktif diperdagangkan (13,21 jt vs 15,5 rb). Mana yang lebih baik tergantung tujuan investasimu.

CTBNPTRO
Kapitalisasi Pasar
4 T39,84 T
Volume
15,5 rb13,21 jt
Lot
155132,11 rb
Perputaran
79,45 jt52,6 M
Harga Rata-rata
5.125,973.981,51
Nilai Transaksi
79,45 jt52,6 M
Harga Ekuilibrium Indikatif
5.0503.970
Volume Ekuilibrium Indikatif
72,92 rb

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

CTBN
Lihat detail
PTRO
Lihat detail

Tentang Citra Tubindo Tbk.

PT Citra Tubindo Tbk (the Company) was established on August 23rd, 1983, on Batam Island under the rules of the Domestic Capital Investment (PMDN) the main activities of the Company are seamless pipe processing, end finishing of Oil Country Tubular Goods (OCTG) and fabricating accessories for the Oil and Gas Industry. The Threading and End Finishing plant commenced commercial operation in 1984 and received American Petroleum Institute (API) in the same year. In 1986 the Company installed and put into operation a precision electro-plating plant which also passed the stringent requirements of MEPSI (Mobil Exploration and Production Services Inc.) standards. The Company has also built an assembly line for Drilltec Protectors, to reduce the dependency on overseas supplies. The products of the Company are distributed among domestic and international oil and gas contractors operating in Indonesia, and increasingly exported to contractors working in countries such as Malaysia, India, Vietnam, the Middle East, Japan Canada, Australia, Venezuela and the Philippines.

Selengkapnya di halaman CTBN

Tentang Petrosea Tbk.

PT Petrosea Tbk (yhe Company) was established under Notarial Deed No.75, dated February 21, 1972, of Djojo Muljadi, LLM, Public Notary in Jakarta, within the framework of the Foreign Capital Investment Law of 1967. PT Petrosea operates in engineering construction and contract mining services. The major shares were taken over by Clough Engineering Group of Australia in 1984.

Selengkapnya di halaman PTRO