Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Graha Layar Prima Tbk. (BLTZ) vs Cikarang Listrindo Tbk. (POWR)

Graha Layar Prima Tbk.Trading
Cikarang Listrindo Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Graha Layar Prima Tbk. dan Cikarang Listrindo Tbk.: Graha Layar Prima Tbk. diperdagangkan di Rp2.540 (kapitalisasi pasar 2,27 T, volume 24 jam 1 rb), sedangkan Cikarang Listrindo Tbk. diperdagangkan di Rp720 (kapitalisasi pasar 11,5 T, volume 24 jam 2,7 jt). Perbedaan utamanya: Cikarang Listrindo Tbk. jauh lebih besar — sekitar 5,1× kapitalisasi pasar Graha Layar Prima Tbk., dan Cikarang Listrindo Tbk. lebih aktif diperdagangkan (2,7 jt vs 1 rb). Mana yang lebih baik tergantung tujuan investasimu.

BLTZPOWR
Kapitalisasi Pasar
2,27 T11,5 T
Volume
1 rb2,7 jt
Lot
1027 rb
Perputaran
2,54 jt1,94 M
Harga Rata-rata
2.540718,57
Nilai Transaksi
2,54 jt1,94 M
Harga Ekuilibrium Indikatif
2.540720
Volume Ekuilibrium Indikatif
331

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

BLTZ
Lihat detail
POWR
Lihat detail

Tentang Graha Layar Prima Tbk.

PT Graha Layar Prima Tbk (the Company) was established in the Republic of Indonesia based on the Notarial Deed No. 1 of Merryana Suryana, S.H., dated February 3, 2004.

Selengkapnya di halaman BLTZ

Tentang Cikarang Listrindo Tbk.

PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.

Selengkapnya di halaman POWR