Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Bank Neo Commerce Tbk (BBYB) vs Krakatau Steel (Persero) Tbk. (KRAS)

Bank Neo Commerce TbkTrading
Krakatau Steel (Persero) Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Bank Neo Commerce Tbk dan Krakatau Steel (Persero) Tbk.: Bank Neo Commerce Tbk diperdagangkan di Rp224 (kapitalisasi pasar 2,88 T, volume 24 jam 9,59 jt), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp216 (kapitalisasi pasar 4,18 T, volume 24 jam 5,77 jt). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. lebih besar dari sisi kapitalisasi pasar, dan Bank Neo Commerce Tbk lebih aktif diperdagangkan (9,59 jt vs 5,77 jt). Mana yang lebih baik tergantung tujuan investasimu.

BBYBKRAS
Kapitalisasi Pasar
2,88 T4,18 T
Volume
9,59 jt5,77 jt
Lot
95,86 rb57,75 rb
Perputaran
2,1 M1,23 M
Harga Rata-rata
219,32212,97
Nilai Transaksi
2,1 M1,23 M
Harga Ekuilibrium Indikatif
224216
Volume Ekuilibrium Indikatif
3,98 rb531

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

BBYB
Lihat detail
KRAS
Lihat detail

Tentang Bank Neo Commerce Tbk

PT Bank Yudha Bhakti Tbk (Bank) was established based on Notarial Deed No. 68 dated September 19, 1989 of Amrul Partomuan Pohan, S.H.,LLM., as amenden Notarial Deed No. 13 dated November 2, 1989, notary ini Jakarta. At first shareholding Bank Yudha Bhakti only owned by the Parent / Central Cooperative TNI and POLRI, but later shareholding Bank Yudha Bhakti is also owned by private

Selengkapnya di halaman BBYB

Tentang Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Selengkapnya di halaman KRAS