Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Tera Data Indonusa Tbk (AXIO) vs Cikarang Listrindo Tbk. (POWR)

Tera Data Indonusa TbkTrading
Cikarang Listrindo Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Tera Data Indonusa Tbk dan Cikarang Listrindo Tbk.: Tera Data Indonusa Tbk diperdagangkan di Rp112 (kapitalisasi pasar 642,41 M, volume 24 jam 408,2 rb), sedangkan Cikarang Listrindo Tbk. diperdagangkan di Rp715 (kapitalisasi pasar 11,5 T, volume 24 jam 3,3 jt). Perbedaan utamanya: Cikarang Listrindo Tbk. jauh lebih besar — sekitar 17,9× kapitalisasi pasar Tera Data Indonusa Tbk, dan Cikarang Listrindo Tbk. lebih aktif diperdagangkan (3,3 jt vs 408,2 rb). Mana yang lebih baik tergantung tujuan investasimu.

AXIOPOWR
Kapitalisasi Pasar
642,41 M11,5 T
Volume
408,2 rb3,3 jt
Lot
4,08 rb32,96 rb
Perputaran
45,51 jt2,35 M
Harga Rata-rata
111,5713,6
Nilai Transaksi
45,51 jt2,35 M
Harga Ekuilibrium Indikatif
112715
Volume Ekuilibrium Indikatif
2588

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

AXIO
Lihat detail
POWR
Lihat detail

Tentang Tera Data Indonusa Tbk

PT Tera Data Indonusa Tbk (the Entity) was established based on Notarial Deed No. 60, dated September 17, 2007 of Agnes Ninik Mutiara Widjaja, S.H., notary in Surabaya. The Entity started its commercial operations in 2007.

Selengkapnya di halaman AXIO

Tentang Cikarang Listrindo Tbk.

PT Cikarang Listrindo Tbk (the Company) was established within the framework of the Domestic Investment Law No. 6 Year 1968 which was amended by Law No. 12 Year 1970, based on Notarial Deed No. 187 of Lukman Kirana, S.H., dated July 28, 1990. About 45 km southeast of Jakarta, starting in 1992, Cikarang Listrindo built its first power plant in the heart of Jababeka Industrial Estate and since then has set the pace for industrial development by providing its customers with a high quality supply of electricity. More than 2,000 customers in 5 industrial estates trust Cikarang Listrindo to deliver reliable and stable power. Among those customers are national and international manufacturers in such sectors as automobiles, electronics, plastics, food and chemicals. They include multinational firms such as PT Astra Honda Motor, PT Mattel Indonesia, PT Omron Manufacturing of Indonesia, PT Komatsu Undercarriage Indonesia, PT Mayora Indah, PT Aisin Indonesia, PT Yanmar Indonesia, PT AJE Indonesia, PT Mitsubishi Electric Automotive, PT Enkei Indonesia, PT Jotun Indonesia, PT Kao Indonesia, PT Kansai Paint Indonesia, PT Kayaba Indonesia and PT Showa Indonesia Manufacturing along with many leading national companies. To meet the industrial customers’ growing demand and to have a more reliable electricity supply system, in 2015 Cikarang Listrindo operates its additional power plant in Megalopolis Manunggal 2100 Industrial Town. Cikarang Listrindo has now a combined plant capacity of 864 MW. An expansion program to raise available power up to 1,144 MW is in progress. Besides satisfying the demand of its industrial customers the company exports power to the national electricity grid of PLN. The company is committed to providing all its customers with the highest level of service in meeting their needs for stable and reliable power. Seamless and smooth supply of electricity gives customers a significant advantage in their operations and affords a level of reliability unsurpassed in Indonesia’s energy market.

Selengkapnya di halaman POWR