Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Asuransi Ramayana Tbk (ASRM) vs Greenwood Sejahtera Tbk. (GWSA)

Asuransi Ramayana TbkTrading
Greenwood Sejahtera Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Asuransi Ramayana Tbk dan Greenwood Sejahtera Tbk.: Asuransi Ramayana Tbk diperdagangkan di Rp270 (kapitalisasi pasar 342,5 M, volume 24 jam 9,6 rb), sedangkan Greenwood Sejahtera Tbk. diperdagangkan di Rp139 (kapitalisasi pasar 1,09 T, volume 24 jam 460 rb). Perbedaan utamanya: Greenwood Sejahtera Tbk. jauh lebih besar — sekitar 3,2× kapitalisasi pasar Asuransi Ramayana Tbk, dan Greenwood Sejahtera Tbk. lebih aktif diperdagangkan (460 rb vs 9,6 rb). Mana yang lebih baik tergantung tujuan investasimu.

ASRMGWSA
Kapitalisasi Pasar
342,5 M1,09 T
Volume
9,6 rb460 rb
Lot
964,6 rb
Perputaran
2,57 jt64,49 jt
Harga Rata-rata
268,15140,19
Nilai Transaksi
2,57 jt64,49 jt
Harga Ekuilibrium Indikatif
143
Volume Ekuilibrium Indikatif
18

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

ASRM
Lihat detail
GWSA
Lihat detail

Tentang Asuransi Ramayana Tbk

PT. Asuransi Ramayana Tbk was established on August 5, 1956 and its name is PT Maskapai Asuransi Ramayana. The aim of establishing the company is to cover insurance of exports and import activities of NV. Agung which was conducted by F.S. Harjadi and R.G. Doeriat.

Selengkapnya di halaman ASRM

Tentang Greenwood Sejahtera Tbk.

Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.

Selengkapnya di halaman GWSA