Perbedaan Alam Sutera Realty Tbk dan Krakatau Steel (Persero) Tbk.: Alam Sutera Realty Tbk diperdagangkan di Rp117 (kapitalisasi pasar 2,3 T, volume 24 jam 7,84 jt), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp216 (kapitalisasi pasar 4,18 T, volume 24 jam 5,77 jt). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. lebih besar dari sisi kapitalisasi pasar, dan Alam Sutera Realty Tbk lebih aktif diperdagangkan (7,84 jt vs 5,77 jt). Mana yang lebih baik tergantung tujuan investasimu.
| ASRI | KRAS | |
|---|---|---|
Kapitalisasi Pasar | 2,3 T | 4,18 T |
Volume | 7,84 jt | 5,77 jt |
Lot | 78,36 rb | 57,75 rb |
Perputaran | 926,45 jt | 1,23 M |
Harga Rata-rata | 118,24 | 212,97 |
Nilai Transaksi | 926,45 jt | 1,23 M |
Harga Ekuilibrium Indikatif | 117 | 216 |
Volume Ekuilibrium Indikatif | 3 rb | 531 |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
PT Alam Sutera Realty Tbk (the company) was established under its original name of PT Adhihutama Manunggal base on notarial deed No.15 of Mrs Erly Soehandjojo, S.H, dated on Nop 3, 1993. The Company's articles of association has been amended several times, most recently by notarial deed No. 71 of Misahardi Wilamarta, S.H., dated Sep 19, 2007, concerning among others, the change in the Company’s name, Anggaran Dasar and public offering.
Selengkapnya di halaman ASRI →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Selengkapnya di halaman KRAS →