Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Asri Karya Lestari Tbk. (ASLI) vs Greenwood Sejahtera Tbk. (GWSA)

Asri Karya Lestari Tbk.Trading
Greenwood Sejahtera Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Asri Karya Lestari Tbk. dan Greenwood Sejahtera Tbk.: Asri Karya Lestari Tbk. diperdagangkan di Rp195 (kapitalisasi pasar 1,22 T, volume 24 jam 1,79 jt), sedangkan Greenwood Sejahtera Tbk. diperdagangkan di Rp139 (kapitalisasi pasar 1,09 T, volume 24 jam 503,7 rb). Perbedaan utamanya: Asri Karya Lestari Tbk. dan Greenwood Sejahtera Tbk. berukuran mirip dari sisi kapitalisasi pasar, dan Asri Karya Lestari Tbk. lebih aktif diperdagangkan (1,79 jt vs 503,7 rb). Mana yang lebih baik tergantung tujuan investasimu.

ASLIGWSA
Kapitalisasi Pasar
1,22 T1,09 T
Volume
1,79 jt503,7 rb
Lot
17,86 rb5,04 rb
Perputaran
349,97 jt70,56 jt
Harga Rata-rata
195,96140,08
Nilai Transaksi
349,97 jt70,56 jt
Harga Ekuilibrium Indikatif
200139
Volume Ekuilibrium Indikatif
7310

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

ASLI
Lihat detail
GWSA
Lihat detail

Tentang Asri Karya Lestari Tbk.

PT Asri Karya Lestari Tbk (‘the Entity’) was established as a limited liability company based on deed No. 05 on December 20, 2008 before Notary Syanti Hardiyanti, SH in Jakarta. The entity started its commercial operations in 2009

Selengkapnya di halaman ASLI

Tentang Greenwood Sejahtera Tbk.

Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.

Selengkapnya di halaman GWSA