Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Asuransi Dayin MitraTbk (ASDM) vs Krakatau Steel (Persero) Tbk. (KRAS)

Asuransi Dayin MitraTbkTrading
Krakatau Steel (Persero) Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Asuransi Dayin MitraTbk dan Krakatau Steel (Persero) Tbk.: Asuransi Dayin MitraTbk diperdagangkan di Rp515 (kapitalisasi pasar 197,76 M, volume 24 jam 200), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp222 (kapitalisasi pasar 4,33 T, volume 24 jam 848,9 rb). Perbedaan utamanya: Krakatau Steel (Persero) Tbk. jauh lebih besar — sekitar 21,9× kapitalisasi pasar Asuransi Dayin MitraTbk, dan Krakatau Steel (Persero) Tbk. lebih aktif diperdagangkan (848,9 rb vs 200). Mana yang lebih baik tergantung tujuan investasimu.

ASDMKRAS
Kapitalisasi Pasar
197,76 M4,33 T
Volume
200848,9 rb
Lot
28,49 rb
Perputaran
103 rb187,87 jt
Harga Rata-rata
515221,31
Nilai Transaksi
103 rb187,87 jt
Harga Ekuilibrium Indikatif
226
Volume Ekuilibrium Indikatif
41

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

ASDM
Lihat detail
KRAS
Lihat detail

Tentang Asuransi Dayin MitraTbk

PT Asuransi Dayin Mitra Tbk (the Company) was incorporated based on Notarial Deed No. 4 of Didi Sudjadi, S.H., dated April 1, 1982.

Selengkapnya di halaman ASDM

Tentang Krakatau Steel (Persero) Tbk.

PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).

Selengkapnya di halaman KRAS